Andover WTP
A complete distribution upgrade along with a newly installed 2 MW standby generator
A complete distribution upgrade along with a newly installed 2 MW standby generator
Looking beyond the phases at hand to optimize the overall infrastructure
State-of-the-art control systems and all new energy efficient equipment
Powered an addition that included emergency generator and fire alarm installations
Electrical subcontractor for normal and emergency electrical systems
Complete ice rink slab and building renovation with LED high bay rink lighting
A steel grate platform elevates the new switchgear and VFD control center above the flood line
Upgraded system that monitors and controls all pump station activities and statuses
Maneuvering around unusual project requirements without sacrificing the end result
Construction of an elementary school from the ground up with various electrical needs